Ice Highway: Difference between revisions

From TNTable
mNo edit summary
mNo edit summary
 
Line 1: Line 1:
{{Project|projectName=Ice Highway|projectPhoto=2024-08-02.png|builtBy=[[Matt]]|projectServer=Current Server 2024|startedDate=July 31st, 2024|completeDate=Ongoing}}
{{Project|projectName=Ice Highway|projectPhoto=2024-08-02.png|builtBy=[[Matt]]|projectServer=Current Server 2024|startedDate=July 31st, 2024|completeDate=Ongoing}}


The '''Ice Highway''' ''(name pending)'' is a planned project for the [[Current Server 2024]] world built by [[Matt]]. The project would have a direct transit tunnel dug through the mountains from spawn to the Megaussy ''(name pending)'', with ice placed on the floors to enable boat travel. Phase 1 of the project to dig out the tunnels started on July 31st, 2024, with it being completed on August 2nd, 2024. Phase 2 began the following day, adding ice and doubling the width in parts of the tunnel to compensate for boat speed.
The '''Ice Highway''' ''(name pending)'' is a planned project for the [[Current Server 2024]] world built by [[Matt]]. The project would have a direct transit tunnel dug through the mountains from spawn to the Megaussy ''(name pending)'', with ice placed on the floors to enable boat travel. Phase 1 of the project to dig out the tunnels started on July 31st, 2024, with it being completed on August 2nd, 2024. Phase 2 is currently under construction and began immediately following Phase 1's conclusion, adding ice and doubling the width in parts of the tunnel to compensate for boat speed. A third and fourth phase are currently planned for a later date.


The idea was first proposed by [[David]].
The idea was first proposed by [[David]].

Latest revision as of 00:00, 4 August 2024

Ice Highway
Project Details
Created By Matt
Server Current Server 2024
Construction Details
Construction Began July 31st, 2024
Completed Ongoing



The Ice Highway (name pending) is a planned project for the Current Server 2024 world built by Matt. The project would have a direct transit tunnel dug through the mountains from spawn to the Megaussy (name pending), with ice placed on the floors to enable boat travel. Phase 1 of the project to dig out the tunnels started on July 31st, 2024, with it being completed on August 2nd, 2024. Phase 2 is currently under construction and began immediately following Phase 1's conclusion, adding ice and doubling the width in parts of the tunnel to compensate for boat speed. A third and fourth phase are currently planned for a later date.

The idea was first proposed by David.