Ice Highway
From TNTable
| Ice Highway | |
|---|---|
| Project Details | |
| Created By | Matt |
| Server | Current Server 2024 |
| Construction Details | |
| Construction Began | July 31st, 2024 |
| Completed | Ongoing |
The Ice Highway (name pending) is a planned project for the Current Server 2024 world built by Matt. The project would have a direct transit tunnel dug through the mountains from spawn to the Megaussy (name pending), with ice placed on the floors to enable boat travel. Phase 1 of the project to dig out the tunnels started on July 31st, 2024, with it being completed on August 2nd, 2024. Phase 2 is currently under construction and began immediately following Phase 1's conclusion, adding ice and doubling the width in parts of the tunnel to compensate for boat speed. A third and fourth phase are currently planned for a later date.
The idea was first proposed by David.