Nether Railway: Difference between revisions

From TNTable
Created page with "{{Project|projectName=Nether Railway|projectPhoto=2024-07-25 18.25.37.png|builtBy=David ''(phase 1)'' Matt ''(phase 1 & 2)'' Michael ''(station)''|projectServer=Current Server|startedDate=Early World Era|completeDate=Mostly Completed}}The '''Nether Railway''' was a community project constructed by the server admins during the Current Server world. They were the primary means of transportation on the server, and were the second iteration of a nether naviga..."
 
Updated server and added subway map
 
(3 intermediate revisions by one other user not shown)
Line 1: Line 1:
{{Project|projectName=Nether Railway|projectPhoto=2024-07-25 18.25.37.png|builtBy=[[David]] ''(phase 1)''
{{Project|projectName=Nether Railway|projectPhoto=2024-07-25 18.25.37.png|builtBy=[[David]] ''(phase 1)''
[[Matt]] ''(phase 1 & 2)''
[[Matt]] ''(phase 1 & 2)''
[[Michael]] ''(station)''|projectServer=Current Server|startedDate=Early World Era|completeDate=Mostly Completed}}The '''Nether Railway''' was a community project constructed by the server admins during the [[Current Server]] world. They were the primary means of transportation on the server, and were the second iteration of a nether navigation system on the TNTable server.
[[Michael]] ''(station)''|projectServer=Monuments, Snowglobes & Red Team|startedDate=Early World Era|completeDate=Mostly Completed}}The '''Nether Railway''' was a community project constructed by the server admins during the [[Monuments, Snowglobes & Red Team]] world. They were the primary means of transportation on the server, and were the second iteration of a nether navigation system on the TNTable server.


The railway consisted of three phases of development. The first phase, constructed by [[David]], [[Matt]], and [[Michael]], built two tunnels - the '''Red Line''' and '''Blue Line''' - to connect spawn to the main bases of regular players at that time. An extension to the railway, the '''Fortress Extension''', was added as part of phase 2 to complete safe passage to the nearest nether fortress, and to merge the Red and Blue lines into one semi-autonomous circle. A separate tunnel - the '''Yellow Line''' - was constructed in phase 3 to link [[Benjamin]] to spawn. Both Phase 2 and Phase 3 were handled by Matt.
The railway consisted of three phases of development. The first phase, constructed by [[David]], [[Matt]], and [[Michael]], built two tunnels - the '''Red Line''' and '''Blue Line''' - to connect spawn to the main bases of regular players at that time. An extension to the railway, the '''Fortress Extension''', was added as part of phase 2 to complete safe passage to the nearest nether fortress, and to merge the Red and Blue lines into one semi-autonomous circle. A separate tunnel - the '''Yellow Line''' - was constructed in phase 3 to link [[Benjamin]], [[Peanut]], and [[Dayache]] to spawn. Both Phase 2 and Phase 3 were handled by Matt.
[[File:Monuments Nether Subway Map.png|thumb|Subway Map]]


== Background ==
== Background ==
The tunnels varied in completion and design at times, but in most cases were constructed out of a stone brick structure, iron barred walls, and a glass-patterned ceiling. The blue line also included stone brick wall supports and blue banners draped upon them. Initially, the blue line concluded outside the Warped Forest biome at [[Michael's Old 2021 Base]], but was extended outward to travel to his [[Michael's Mountain Base|mountain base]].
The tunnels varied in completion and design at times, but in most cases were constructed out of a stone brick structure, iron barred walls, and a glass-patterned ceiling. The blue line also included stone brick wall supports and blue banners draped upon them. Initially, the blue line concluded outside the Warped Forest biome at [[Michael's Old 2021 Base]], but was extended outward to travel to his [[Michael's Mountain Base|mountain base]].


The Yellow Line, which connected Benjamin's base to Spawn, began construction in October 2022. It features yellow lightning bolts down the main staircase section, in reference to Benjamin's Pikachu skin.
The Yellow Line began construction in October 2022. It features yellow lightning bolts down the main staircase section, in reference to Benjamin's Pikachu skin. It linked directly to Benjamin's base, and later expanded out to Peanut and Dayache's base with a path of various nether blocks, and andesite.


== Statistics ==
== Statistics ==
Line 56: Line 57:
|-
|-
|Yellow Line
|Yellow Line
|TBA
|376 blocks
|-
|Peanut Extension
|72 blocks
|-
|-
|'''TOTAL'''
|'''TOTAL'''
|'''TBA'''
|'''448 blocks'''
|}
|}


Line 70: Line 74:
File:2024-07-25 18.25.52.png|Red Team's Station
File:2024-07-25 18.25.52.png|Red Team's Station
File:2024-07-25 18.31.43.png|Nether Fortress Station
File:2024-07-25 18.31.43.png|Nether Fortress Station
File:2024-07-25 21.33.39.png|Benjamin's portal
File:2024-07-25 21.47.54.png|Peanut & Dayache's portal
File:2024-07-25 18.33.22.png|Mesa Station ''(unfinished)''
File:2024-07-25 18.33.22.png|Mesa Station ''(unfinished)''
File:2024-07-25 18.36.34.png|A section of the Phase 2 extension
File:2024-07-25 18.36.34.png|A section of the Phase 2 extension
File:2024-07-25 21.39.45.png|A section of the Phase 3 extension
File:2024-07-25 21.58.18.png|Blue banners adorned in the Blue Line tunnel
File:2024-07-25 21.31.13.png|Lightning bolt adorned in the Yellow Line tunnel
</gallery>
</gallery>



Latest revision as of 16:48, 29 July 2024

Nether Railway
Project Details
Created By David (phase 1) Matt (phase 1 & 2) Michael (station)
Server Monuments, Snowglobes & Red Team
Construction Details
Construction Began Early World Era
Completed Mostly Completed


The Nether Railway was a community project constructed by the server admins during the Monuments, Snowglobes & Red Team world. They were the primary means of transportation on the server, and were the second iteration of a nether navigation system on the TNTable server.

The railway consisted of three phases of development. The first phase, constructed by David, Matt, and Michael, built two tunnels - the Red Line and Blue Line - to connect spawn to the main bases of regular players at that time. An extension to the railway, the Fortress Extension, was added as part of phase 2 to complete safe passage to the nearest nether fortress, and to merge the Red and Blue lines into one semi-autonomous circle. A separate tunnel - the Yellow Line - was constructed in phase 3 to link Benjamin, Peanut, and Dayache to spawn. Both Phase 2 and Phase 3 were handled by Matt.

Subway Map

Background

The tunnels varied in completion and design at times, but in most cases were constructed out of a stone brick structure, iron barred walls, and a glass-patterned ceiling. The blue line also included stone brick wall supports and blue banners draped upon them. Initially, the blue line concluded outside the Warped Forest biome at Michael's Old 2021 Base, but was extended outward to travel to his mountain base.

The Yellow Line began construction in October 2022. It features yellow lightning bolts down the main staircase section, in reference to Benjamin's Pikachu skin. It linked directly to Benjamin's base, and later expanded out to Peanut and Dayache's base with a path of various nether blocks, and andesite.

Statistics

Main Line

Section Length (blocks)
Red Line 398 blocks
Blue Line 450 blocks
Phase 1 (Red + Blue) 798 blocks
Fortress Extensions 491 blocks
TOTAL 1285 blocks

Fortress Extension

Section Length (blocks)
Fortress Extension 1124 blocks
Mesa (unfinished) 253 blocks
TOTAL 1377 blocks

Yellow Line

Section Length (blocks)
Yellow Line 376 blocks
Peanut Extension 72 blocks
TOTAL 448 blocks

Gallery

Trivia

  • This is the second time a nether tunnel system has been created, the first being the Nether Tunnels.
  • Coincidentally, the portal to the Mesa is directly above the site of the Relog & Recover.