Nether Railway

From TNTable
Nether Railway
Project Details
Created By David (phase 1) Matt (phase 1 & 2) Michael (station)
Server Monuments, Snowglobes & Red Team
Construction Details
Construction Began Early World Era
Completed Mostly Completed


The Nether Railway was a community project constructed by the server admins during the Monuments, Snowglobes & Red Team world. They were the primary means of transportation on the server, and were the second iteration of a nether navigation system on the TNTable server.

The railway consisted of three phases of development. The first phase, constructed by David, Matt, and Michael, built two tunnels - the Red Line and Blue Line - to connect spawn to the main bases of regular players at that time. An extension to the railway, the Fortress Extension, was added as part of phase 2 to complete safe passage to the nearest nether fortress, and to merge the Red and Blue lines into one semi-autonomous circle. A separate tunnel - the Yellow Line - was constructed in phase 3 to link Benjamin, Peanut, and Dayache to spawn. Both Phase 2 and Phase 3 were handled by Matt.

Subway Map

Background

The tunnels varied in completion and design at times, but in most cases were constructed out of a stone brick structure, iron barred walls, and a glass-patterned ceiling. The blue line also included stone brick wall supports and blue banners draped upon them. Initially, the blue line concluded outside the Warped Forest biome at Michael's Old 2021 Base, but was extended outward to travel to his mountain base.

The Yellow Line began construction in October 2022. It features yellow lightning bolts down the main staircase section, in reference to Benjamin's Pikachu skin. It linked directly to Benjamin's base, and later expanded out to Peanut and Dayache's base with a path of various nether blocks, and andesite.

Statistics

Main Line

Section Length (blocks)
Red Line 398 blocks
Blue Line 450 blocks
Phase 1 (Red + Blue) 798 blocks
Fortress Extensions 491 blocks
TOTAL 1285 blocks

Fortress Extension

Section Length (blocks)
Fortress Extension 1124 blocks
Mesa (unfinished) 253 blocks
TOTAL 1377 blocks

Yellow Line

Section Length (blocks)
Yellow Line 376 blocks
Peanut Extension 72 blocks
TOTAL 448 blocks

Gallery

Trivia

  • This is the second time a nether tunnel system has been created, the first being the Nether Tunnels.
  • Coincidentally, the portal to the Mesa is directly above the site of the Relog & Recover.