Ice Highway: Difference between revisions
From TNTable
MatrVincent (talk | contribs) Created page with "{{Project|projectName=Ice Highway|projectPhoto=2024-08-02.png|builtBy=Matt|projectServer=Current Server 2024|startedDate=July 31st, 2024|completeDate=Ongoing}} The '''Ice Highway''' ''(name pending)'' is a planned project for the Current Server 2024 world built by Matt. The project would have a direct transit tunnel dug through the mountains from spawn to the Megaussy ''(name pending)'', with ice placed on the floors to enable boat travel. Phase 1 of the pro..." |
(No difference)
|
Revision as of 10:31, 2 August 2024
| Ice Highway | |
|---|---|
| Project Details | |
| Created By | Matt |
| Server | Current Server 2024 |
| Construction Details | |
| Construction Began | July 31st, 2024 |
| Completed | Ongoing |
The Ice Highway (name pending) is a planned project for the Current Server 2024 world built by Matt. The project would have a direct transit tunnel dug through the mountains from spawn to the Megaussy (name pending), with ice placed on the floors to enable boat travel. Phase 1 of the project to dig out the tunnels started on July 31st, 2024, with it being completed on August 2nd, 2024. A second phase is currently in pre-planning.
The idea was first proposed by David.
