Revision as of 21:19, 2 December 2022 by MatrVincent (talk | contribs) (Created page with "{{Project|projectName=Christmas Snowglobe|projectPhoto=Christmas Snowglobe Exterior.png|builtBy=Matt|projectServer=Current Server|mapLink=https://tntable.us-east-1.linodeobjects.com/server_map/index.html#/1208/64/114/-2/World/survivalday|startedDate=November 12th, 2022|completeDate=November 24th, 2022 (Phase 1) *Mostly Completed (Phase 2) *TBA (Phase 3)}} The '''Christmas Snowglobe''' is an ongoing ocean monument construction project, created by Matt on the Cu...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Christmas Snowglobe
Project Details
Created By Matt
Server Current Server
Map Link View on Map
Construction Details
Construction Began November 12th, 2022
Completed November 24th, 2022 (Phase 1) *Mostly Completed (Phase 2) *TBA (Phase 3)



The Christmas Snowglobe is an ongoing ocean monument construction project, created by Matt on the Current Server world. The build consists of a pre-generated ocean monument near the Lush Ravine, completely encased in glass blocks and drained of all of its surrounding water to resemble a snowglobe, and outfitted with Christmas decorations. It is intended as a possible venue for the Current Server's first Christmas celebration, should the occasion present itself.

The process of draining the exterior water and creating the glass dome is listed as phase 1 of the build, and was completed over 12 days. The snowy interior and various Christmas decorations became phase 2 of the build, and is currently in progress. A third phase is in the works to drain the interior of the ocean monument, possibly setting up a guardian farm in the process.

Gallery

Coming Soon

Trivia

  • Statistics behind the build include:
    • 36,336 sand blocks and 27,885 red sand blocks (approximately) were used, either assisting in the draining of the monument, construction of the dome, or both.
    • 21,974 glass blocks (approximately) were used in creation of the dome.
    • 633 guardians were killed during the construction time.
    • 121 sea lanterns were created for the candy canes, requiring 605 prismarine crystals from guardian drops.
  • This is the third project by Matt involving ocean monuments, the first being the Monumental Replacement and Chicken and Iron's Guardian Farm.