Christmas Snowglobe: Difference between revisions

From TNTable
No edit summary
m Updated server name and links
Line 1: Line 1:
{{Project|projectName=Christmas Snowglobe|projectPhoto=Christmas Snowglobe Exterior.png|builtBy=[[Matt]]|projectServer=Current Server|mapLink=https://server-map.tntable.ca/index.html#overworld:1202:59:112:55:1.05:0.7:0:0:perspective|startedDate=November 12th, 2022|completeDate=Ongoing (Phase 1 completed Nov. 24th, Phase 3 completed Dec. 10th)}}
{{Project|projectName=Christmas Snowglobe|projectPhoto=Christmas Snowglobe Exterior.png|builtBy=[[Matt]]|projectServer=Monuments, Snowglobes & Red Team|mapLink=https://server-map.tntable.ca/index.html#overworld:1202:59:112:55:1.05:0.7:0:0:perspective|startedDate=November 12th, 2022|completeDate=Ongoing (Phase 1 completed Nov. 24th, Phase 3 completed Dec. 10th)}}


The '''Christmas Snowglobe''' is an ongoing ocean monument construction project and guardian farm, created by [[Matt]] on the [[Current Server]] world. The build consists of a pre-generated ocean monument near the [[Lush Ravine]], completely encased in glass blocks and drained of all of its surrounding water to resemble a snowglobe, and outfitted with Christmas decorations. It also includes an automatic, totally ethical, Guardian Farm within the monument. It is intended as a possible venue for the [[Current Server]]'s first Christmas celebration, should the occasion present itself.
The '''Christmas Snowglobe''' is an ongoing ocean monument construction project and guardian farm, created by [[Matt]] on the [[Monuments, Snowglobes & Red Team]] world. The build consists of a pre-generated ocean monument near the [[Lush Ravine]], completely encased in glass blocks and drained of all of its surrounding water to resemble a snowglobe, and outfitted with Christmas decorations. It also includes an automatic, totally ethical, Guardian Farm within the monument. It is intended as a possible venue for the [[Current Server|Monuments, Snowglobes & Red Team]]'s first Christmas celebration, should the occasion present itself.


The process of draining the exterior water and creating the glass dome is listed as phase 1 of the build, and was completed over 12 days. The snowy interior and various Christmas decorations became phase 2 of the build, and is currently in progress. A third phase to drain the ocean monument itself and create the Guardian Farm was completed in a 2 day span. A fourth phase to decorate the interior of the monument is under consideration.
The process of draining the exterior water and creating the glass dome is listed as phase 1 of the build, and was completed over 12 days. The snowy interior and various Christmas decorations became phase 2 of the build, and is currently in progress. A third phase to drain the ocean monument itself and create the Guardian Farm was completed in a 2 day span. A fourth phase to decorate the interior of the monument is under consideration.

Revision as of 16:45, 29 July 2024

Christmas Snowglobe
Project Details
Created By Matt
Server Monuments, Snowglobes & Red Team
Map Link View on Map
Construction Details
Construction Began November 12th, 2022
Completed Ongoing (Phase 1 completed Nov. 24th, Phase 3 completed Dec. 10th)



The Christmas Snowglobe is an ongoing ocean monument construction project and guardian farm, created by Matt on the Monuments, Snowglobes & Red Team world. The build consists of a pre-generated ocean monument near the Lush Ravine, completely encased in glass blocks and drained of all of its surrounding water to resemble a snowglobe, and outfitted with Christmas decorations. It also includes an automatic, totally ethical, Guardian Farm within the monument. It is intended as a possible venue for the Monuments, Snowglobes & Red Team's first Christmas celebration, should the occasion present itself.

The process of draining the exterior water and creating the glass dome is listed as phase 1 of the build, and was completed over 12 days. The snowy interior and various Christmas decorations became phase 2 of the build, and is currently in progress. A third phase to drain the ocean monument itself and create the Guardian Farm was completed in a 2 day span. A fourth phase to decorate the interior of the monument is under consideration.

Gallery

Coming Soon

Trivia

  • Statistics behind the build include:
    • 36,336 sand blocks and 27,885 red sand blocks (approximately) were used, either assisting in the draining of the monument, construction of the dome, or both.
    • 21,974 glass blocks (approximately) were used in creation of the dome.
    • 633 guardians were killed during the construction time.
    • 2230 times wet sponges were used, both when soaking up and nether-draining the water.
    • 121 sea lanterns were created for the candy canes, requiring 605 prismarine crystals from guardian drops.
  • This is the third project by Matt involving ocean monuments, the first being the Monumental Replacement and Chicken and Iron's Guardian Farm.